Phase 190 / 19 · 0%
This phase is still ahead.
19.1 Release candidate
0 of 4 done- Feature freeze and tag
v1.0.0-rc.1; only fixes from here on. - Full regression checklist in
docs/releases/regression.md(every system, every class from 1 to 10, every quest, every platform), run and passed. - Final backup and restore drill, and a written rollback plan for the launch build.
- Performance and security checks re-run against the release candidate, with every scaling.md tier met so far re-measured on
prod.
19.2 Launch preparation
0 of 5 done- Launch-day runbook: what to watch, rollback steps and how to communicate problems.
- Website launch update: “Play now” hero, final screenshots and a gameplay trailer, updated FAQ, and a /press page (description, fact sheet, logos, screenshots, contact).
- Owner Choose the launch date.
- Owner Approve the launch devlog post and announcements.
- Character wipe carried out if decided in Phase 18, with a backup taken first.
19.3 Launch
0 of 3 done- Tag
v1.0.0; the release pipeline publishes every build, and /downloads and /progress show 1.0. - Owner Publish the launch announcements.
- Monitor closely for the first week and ship
v1.0.xhotfixes as needed.
19.4 After launch
0 of 3 done- Post-mortem in
docs/releases/v1.0-postmortem.md: what went well, what didn’t and what was learned. -
docs/walkthroughs/phase-19-launch.md: the whole architecture end to end as it stands at 1.0. - Post-1.0 roadmap draft in
docs/design/roadmap-post-1.0.md, built from Deferred and player feedback.
Acceptance criteria
0 of 4 done- v1.0.0 can be downloaded for Windows, macOS and Linux from lorehallow.com.
- The first launch week had no data loss and 99% or better uptime.
- Every earlier phase in this file is complete.
- Owner Declare Lorehallow 1.0 shipped.